In the past, we have successfully executed chemical cleaning of 240TPH PF fired boiler and main steam
pipe line at ShriramAlkali & Chemicals, Jhagadia in the year 2008; also we have successfully executed
chemical cleaning of 1×200 MW, 1×210 MW, 4×120 MW boilers at Koradi TPS, 2×210 MW boilers at
Nasik TPS, 1×210 MW boiler at Khaperkheda TPS of MSEB, 2×210 MW Boilers at Korba West Bank
of M/s CSEB, 1×200 MW Ansaldo Boiler of U#3 at Ramagundam STPS of M/S NTPC under M/s
BHEL, 2×120 MW boilers at Santaldih TPS & 3×80 MW boilers at Bandel TPS of WBPDCL, chemical
cleaning of 150 TPH Unit#4 CFBC Thyssen Krupp boiler (FBB – 9) at HINDALCO (Unit-Birla
Copper Ltd.) Dahej, Gujarat, Chemical cleaning of 150 TPH CFBC boiler at GHCL, Veraval, Gujarat,
CFBC Boiler at J. K. Paper Ltd, 3×175 TPH Boilers at Essar Oil Ltd.-Gujarat under M/s Thermax,
chemical cleaning of 3×350MW boiler including feed water system of SEPCO China at GMR Energy,
Angul, Odisha, Chemical cleaning of 495TPH CFBC Boilers at 2×150MW U#1 & 2 at Meenakshi
Energy Pvt. Ltd Project, Thamminapatnam and 2×240TPH CFBC Boilers at 2×60MW Power Project at
Indian Metal and Ferro Alloys, Choudwar, Cuttack, Odisha under M/s Thermax Ltd., Acid cleaning of
3×67.5 MW Boiler & Main Steam Lines at Tata Power, Kalinganagar, Odisha under M/s Thermax Ltd.
6×135MW, China make boilers at JSPL, 4×210TPH , 2×425 TPH CFBC Boilers at Bhushan Power &
Steel Ltd., Odisha, 4×250TPH CFBC Boilers at Bhushan Energy Ltd., Meeramandali, Odisha &
Chemical cleaning of Boiler and other systems of 1×135MW (Unit-2) manufactured by M/s Cethar
Vessels Limited (CVL) from M/s Vandana Vidhyut Ltd., Korba, Chhattisgarh.